Base Laying
Our raft system with its simple common sense approach offers you an excellent alternative to the more traditional concrete or slab base.
This method allows more air flow, also much less water is in contact with the floor bearers keeping the building dry, which makes your investment last longer.
No foundation needs to be dug, or concrete to set, means we can finish laying the raft and erecting your building the same day. Not only does this simple system save you money it is kinder to the environment, and is easy to reposition if you need to relocate you building, saving you breaking up the old concrete and disposing it.
To install a raft we ask of you is to ensure the area is leveled out for us prior to us arriving, we will place slabs at pressure points to prevent subsidence and bring the area to a level, a raft is then placed on top, ready for the shed to be built.
6x4 | 7x5 | 8x5 | 8x6 | 8x8 |
£80 | £90 | £99 | £110 | £140 |
10x6 | 10x8 | 12x6 | 12x8 | |
£150 | £180 | £200 | £250 |